Effective immediately, the eastbound traffic on the Hypoluxo Bridge over Florida’s Turnpike will be shifted slightly to the north as part of the next bridge reconstruction phase. During this traffic shift, the sidewalk on the south side of the bridge will be closed to pedestrian traffic. Pedestrians will be able to use the sidewalk on the north side of the bridge.
One lane in each direction of the Hypoluxo Road bridge will remain open to all traffic and emergency vehicles. Most construction activities will take place between the hours of 7:00 am and 9:00 pm, seven days a week, however, some activities can only be performed at night and during off-peak hours on the Turnpike to minimize traffic delays for most drivers
Message boards have been installed along Hypoluxo Road to inform drivers of the change. The speed limit along this portion of Hypoluxo Road has been lowered to 35 mph during these construction activities. Motorists are encouraged to use caution, drive slowly through the area, and follow posted signage.
This work is part of the project widening Florida’s Turnpike from Boynton Beach Boulevard to Lake Worth Road. Pleas note, this schedule may change due to inclement weather or unforeseen conditions.
We encourage all residents to enter and exit during this time through the Lyons Road Residents gate.
We are currently in the process of making adjustment at the Lyons Road gate in anticipation of the increase in use and to facilitate additional access for first responders.
Any concerns or questions please contact the General Manager.
Thank you in advance for your cooperation and patience.
CLICK HERE To View the Details and Map of the first Phase of the project
CLICK HERE To View the Florida Turnpike Construction Widening FAQ